Most board conversations about lender eligibility are about money — reserves, delinquencies, the budget. The rule that most often stops a sale is about the building itself.
Fannie Mae's Selling Guide lists projects in need of critical repairs among its ineligible project characteristics. A project with unaddressed critical repairs is ineligible until the repairs are completed and documented. No reserve balance cures it.
What counts as a critical repair?
The Guide defines projects in need of critical repairs as those needing repairs or replacements that significantly impact the safety, soundness, structural integrity or habitability of the project's buildings, or the financial viability or marketability of the project. It then lists conditions that count:
- Material deficiencies which, if left uncorrected, have the potential to result in or contribute to critical element or system failure within one year;
- Any mold, water intrusions or potentially damaging leaks to the project's buildings;
- Advanced physical deterioration;
- Any project that failed to pass state, county or other jurisdictional mandatory inspections or certifications specific to structural safety, soundness and habitability; or
- Any unfunded repairs costing more than $10,000 per unit that should be undertaken within the next 12 months — not counting repairs made by the unit owner or repairs funded through a special assessment.
The Guide offers examples of items to consider: sea walls, elevators, waterproofing, stairwells, balconies, foundation, electrical systems, parking structures and other load-bearing structures. In Chicago, read that list as porches and decks, masonry and lintels, elevators, and the parking structure under the building.
What is not a critical repair?
Two carve-outs matter, and boards should know both before they panic.
First, if damage or deferred maintenance is isolated to one or a few units and does not affect the overall safety, soundness, structural integrity or habitability of the project, the critical-repair requirements do not apply. One unit's leaking window is not a building-wide disqualifier.
Second, routine repairs are not critical. The Guide describes routine work as preventative in nature or part of normal capital replacements — focused on keeping the project fully functioning and serviceable — and accomplished within the project's normal operating budget or through special assessments that are within guidelines.
That second carve-out is the one to act on. Work that is planned, funded and part of normal capital replacement is routine. The same work, unfunded and overdue, starts to look like advanced physical deterioration. The difference is often a reserve line and a schedule, which is to say the difference is the board.
Read the $10,000-per-unit threshold carefully
It is the most concrete figure in the definition and the most misread. Three things to hold onto:
- It is per unit, not per project. In a 24-unit building, unfunded 12-month repairs above roughly $240,000 cross the line. In a 200-unit high-rise, the figure is in the millions.
- It applies to repairs that should be undertaken within the next 12 months. A known $2 million facade project due in 2032 is not caught by this prong.
- It excludes repairs funded through a special assessment and repairs made by the unit owner. So a board that approves and begins collecting a special assessment for the work has changed the analysis — which is a strong argument for deciding rather than deferring.
What happens with evacuation orders and failed inspections?
A project with an evacuation order due to an unsafe condition — partial or total — is ineligible until the unsafe condition has been remediated and the buildings are deemed safe for occupancy. There is no workaround.
Failing a mandatory jurisdictional inspection or certification specific to structural safety, soundness and habitability is itself listed as a critical-repair condition. For Chicago buildings this is where the city's compliance regime and the lender's rules meet: the facade inspection, the annual elevator inspection, the life-safety evaluation for high-rises, the porch and deck requirements. See our guides to Chicago facade compliance, elevator inspections, life-safety planning and the compliance calendar that ties them together.
How do inspection reports get pulled into the review?
If a structural or mechanical inspection was completed within three years of the lender's project review date, the lender must obtain and review the report. The report cannot indicate that critical repairs are needed, that an evacuation order is in effect, or that regulatory actions are required.
If the report indicates unaddressed critical repairs, the project is ineligible until the repairs are completed and documented. To clear it, the lender must review an engineer's report or substantially similar document showing the completed repairs resolved the safety, soundness, structural integrity or habitability concerns.
There is a lesson in that sequence that boards consistently learn late. An engineering report you commissioned becomes a document a lender will read. That is not a reason to avoid commissioning one — avoiding the report does not make the condition disappear, and a board that never investigates a known problem has a fiduciary issue of its own. It is a reason to finish what a report starts, and to get the close-out letter when the work is done. An engineer's report describing a problem, with nothing on file showing the fix, is the worst of both worlds.
How are special assessments reviewed?
Special assessments may be current or planned, and the lender must obtain and review, for each one:
- The purpose of the special assessment;
- When it was approved, and whether it is planned — approved by the owners but not yet initiated by the board — or already being executed;
- The original amount and the remaining amount to be collected; and
- The expected date it will be paid in full.
If the special assessment is associated with a critical repair and the issue is not remediated, the project is ineligible. So a special assessment is not a shield on its own. It helps where it funds work that is proceeding; it does not help where the condition is still there and the money is still being collected.
Keep a clean one-page summary of every open and planned special assessment with those four facts on it. Boards that cannot answer these questions quickly are the boards whose buyers wait. Our guide to special assessments in Illinois covers the owner-facing side.
What else makes a project ineligible that boards can control?
Several things on the list are not about repairs at all:
- Delinquencies. Under a Full Review, no more than 15% of the total units may be 60 days or more past due on common expense assessments, and separately no more than 15% may be 60 days or more past due on each special assessment. In a 40-unit building that is six units. See our guide to the delinquency escalation process.
- Litigation. Projects where the association is named a party to pending litigation are addressed in the ineligible-project rules, with their own detail.
- Termination or deconversion. A project must not be the subject of an action that would cause it to cease to exist, including termination, deconversion or dissolution — and this includes a project that has voted or is in the process of voting on such an action. Illinois boards should read that alongside our guide to condo deconversion thresholds: starting a deconversion vote has financing consequences for every owner who is not selling.
- Commercial space. Space used for nonresidential or commercial purposes may not exceed 35% of the project.
- Insolvency proceedings. A bankruptcy, insolvency, liquidation or receivership proceeding, or a substantially similar action, makes a project ineligible.
What documents does a lender look at?
The Guide names the kinds of documents a lender may review to determine whether a project meets the physical condition requirements: HOA board meeting minutes, engineer reports, structural and mechanical inspection reports, reserve studies, a list of necessary repairs provided by the association or its management company, a list of special assessments, and substantially similar documentation.
Board minutes are on that list. Boards sometimes write minutes as though nobody outside the room will read them. A lender may. So will a buyer's attorney and, eventually, an owner's. Minutes should record decisions and the basis for them accurately — which is good practice anyway, and is why a fiduciary-duty review usually starts with the minute book.
The questionnaire itself is Form 1076, the Condominium Project Questionnaire. It is optional for lenders, who may use a substantially similar form, so expect variation in what arrives. Answer whatever form arrives accurately and consistently with the minutes and the budget. A questionnaire that contradicts the documents behind it causes more delay than a questionnaire with an uncomfortable answer.
Board checklist
- List every known deficiency in the common elements and mark which should be done within 12 months.
- Total the 12-month unfunded figure and divide by the unit count. Compare to $10,000 per unit.
- Pull every structural or mechanical inspection report from the last three years and read what it says.
- For any report that found a problem, locate the document showing the fix. If there is none, get one.
- Confirm there is no outstanding failed jurisdictional inspection or certification, and no evacuation order.
- Check for mold, water intrusion and active leaks, and treat them as the priority they are in this definition.
- Build the one-page special assessment summary with purpose, approval date and status, original and remaining amount, and payoff date.
- Run the 60-day delinquency percentage, for regular assessments and for each special assessment.
- Make sure the budget, the minutes and the questionnaire answers describe the same building.
- Review how reserves and the 15% reserve change interact with the repair plan for 2027.
Related reading: Fannie Mae and Freddie Mac condo eligibility.
How Stellar helps
Stellar keeps a current repair and compliance picture for each association, so a questionnaire can be answered from a file rather than reconstructed, and so the board hears about an eligibility problem months before a buyer's lender does. If your board wants that review before the selling season, contact our office or see our maintenance coordination and financial management services.
This article is general information for community association boards and is not lending, engineering or legal advice. It summarizes the Fannie Mae Selling Guide as published; the agencies update their guides and lenders may apply overlays of their own. Whether a particular condition is a critical repair is a judgment a lender makes on the documents in front of it.
For the reserve side of this topic, read what Illinois law means by reasonable reserves.
Boards comparing management proposals can also review what condo management costs in Chicago.